Q: How long is the delivery time? A: The sample delivery time is 7-10 days, and the batch production delivery time is 15-35 days (depending on the difficulty of production). Our production follows PPAP and controls the entire production process to ensure delivery of products within the promised delivery time.
Q: How is your quality? A: We are committed to providing you with good products and will provide you with authentic inspection reports before shipment. We will only ship with your permission.
Q: Will you be able to work with our engineering team to review drawings and provide quick, estimated pricing for desired changes?
A: Yes, our engineers respond very quickly. If there is anything to be modified in the product, we can offer you a new price as soon as you tell us.
Q: What tolerances can you achieve?
A: There is not a given set of tolerances that fits all processes and materials. In every case, the final tolerances on your part will depend on a number of factors, including but not limited to:
~Part size
~Design Geometry
~The number, type, and size of features
~Material(s)
~Surface finish
~Manufacturing process
Once your order is confirmed, we will review your design andprovide a design for manufacturing review, pointing out any areas where we may not be able to achieve your desired tolerances. It's helpful if you can specify which areas in your design have critical tolerances that must be met and which can be slightly modified if needed to reduce the time and costs involved. Here are some general tolerance guidelines: General tolerances for CNC machining in metal and plastic Refer to DIN ISO 2768 All manufacturing and technical specifications need to be clearly specified in the 2D drawings in order to be followed.
Q: If we don't have a shipping forwarder in China, would you do this for us?
A: We can offer you the best shipping line to ensure you can get the goods timely at the best price.